top of page

CRITICAL SPACE INFRASTRUCTURE

We execute turnkey Passive Infrastructure development projects for Critical Space like Data Centre, NOC and Control Rooms. The job included but not limited to any kind of interior work of data centre grade such as 1-2 Hrs Fire Rated Gypsum Partition Work, High Load Bearing Type Raised Flooring, 1 hr Fore Rated Suspended Ceiling, 2 Hrs Fire Rated Steel Doors, 2 Hrs Fire Rated Glass Paneling / Window etc.

Electrical Distribution System, Network Cabling and Switch Architecture, OFC Connectivity, CCTV Surveillance System, Biometric type Access Control management, BMS System etc

bottom of page